Stellar Industries 5521 Manual do Utilizador Página 23

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 42
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 22
Installation 
Hydraulic Installation
1. After mounting, locate the pressure and return
lines. Note: Pressure line is 3/8” hose; Return line
is 1/2” hose. Hoses are terminated using swivel
fittings.
2. Install hydraulic lines per diagram below. Note:
Stabilizer valve supplies oil to crane using the
Power Beyond feature.
3. Install hydraulic reservoir with return filter. Attach
pump pressure line to valve, return link to tank.
4. Fill system with hydraulic oil (See Stellar®
Lubrication Recommendations for fluid details).
Stabilizer Functions
Stabilizer Functions
Typical Stabilizer Valve
with Power Beyond Capabilities
Vista de página 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 41 42

Comentários a estes Manuais

Sem comentários