Stellar Industries SI-75 Manual do Utilizador Página 12

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 94
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 11
Stellar Cable Hoist Owner’s Manual
Unloading Operation - O.R. and I.O. Models
Back the truck up in front of where the
container is to be spotted. Allow room
for the container to roll-off of the hoist.
1
Raise the hoist and retract the
reeving cylinders. Allow gravity to
pull the container to the ground.
Once the rear rollers are on the
ground, allow the truck to roll out
from under the container.
Once the container is on the ground,
lock the truck brakes and disconnect
the cable and secure it to the hoist.
Lower the hoist to the full down position.
Pull away from the container.
Disengage the PTO.
2
3
4
5
Vista de página 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 93 94

Comentários a estes Manuais

Sem comentários