Stellar Industries SI-75 Manual do Utilizador Página 43

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 94
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 42
Installation 
Position fender to allow
for max air bag travel
and spring compression.
Position fender to allow
for max walking beam
travel.
Position fender to allow adequate
clearance between fender & hydraulic
cylinder in upright extended position.
0.25” Weld Around
(6 Places)
Rear Fender
Tube Weldment
Fender
Weldment
1/2NC x 2” Square
Head cone Point
Set Screw
1/2NC Hex Nut
5/8NC x 5” GRD5
Cap ScrewFender
Connector:
Weld into place with five (5) 1” welds after
fenders and bumpers have been installed.
Front
Fender
Tube Weldment
Front Fender
Tube Weldment
End Cap
5/8” Std. Flat Washer
Fender
Weldment
End
Cap
5/8NC Self Locking Nut
Gusset
Spacer
1” x 2.5” x 2.5”
Steel Tandem/Tri-Axle
Step 12a: Fender Installation - Steel Tandem/Tri-Axle
Vista de página 42
1 2 ... 38 39 40 41 42 43 44 45 46 47 48 ... 93 94

Comentários a estes Manuais

Sem comentários